| Client | OLMA |
|---|---|
| General contractor | Glory Group Development |
| Location | Uzbekistan |
| Area | 1,500 m² |
| Start | May 2024 |
| Completion | June 2026 |
| Duration | 26 months |
| Status | Completed |
Glory Group Development (GGD) was the general contractor for OLMA supermarket network. The client is OLMA. Location: Uzbekistan . The total floor area is 1,500 m². Work started in May 2024 and was completed in June 2026; the project took 26 months. As part of the project, GGD carried out: Electrical installation and equipment connection on site.
Provide electrical preparation of retail premises and connect equipment to designated power supply points.
The works support the electrical readiness of retail equipment.